Here's the tap into the line out of the meter.
Then a short run through a PVC sleeve.
And all done; just waiting for the concrete slab and a tub.
I'll try to get some shots of the kids as they leave for school tomorrow. Should be getting home Tuesday around sunset.
Weather continues to be perfect.